Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
[Recording Time]
136 minutes
[Screen Size]
Wide
[Video Bonus]
Documentary on the Date of Switching to Elevation
[Number of Tickets]
1
[Video Comments]
This is a railway work showing the situation before the elevation of the Nishitetsu Tenjin Omuta line, which was elevated by the construction work in August, 2022. A camera gets on a local train that departed from Chikushi station. It goes through Nishitetsu-Fukuoka station and then goes to Omuta station as an express train.
[Country Name of Manufacture]
Date