Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
[Recording Time]
90 minutes
[Screen Size]
Wide
[List of Contents]
Overview ・ Opening of Nagano / Extension Work ・ Disappeared Train / Introduction of Series E7 / Drainer / Land Transport / Test Drive / New Third Sector Railway / Kanazawa Opening and Introduction of Routes
[Number]
1
[Video Comments]
This is a video material that describes the railways in Hokuriku with a new look due to the timetable revision in March 2015. It mainly introduces the whole aspect of the opening of the Hokuriku Shinkansen from Nagano to Kanazawa, and introduces the movement of the former parallel conventional lines that were separated from JR along with the opening.