Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
[Recording time]
75 minutes
[Screen size]
Standard
[List of contents]
Opening of Kyushu Shinkansen / S2 / R1 transportation / R1 test operation start and tour / Kumamoto General Rolling Stock Depot start / New era
[Number of tickets]
1 ticket
[Video comments]
This book introduces the railways in Kyushu that have entered a new era with the opening of the Kyushu Shinkansen. It includes the final operation of limited express sleeping car and limited express trains on the eve of the timetable revision, ground transportation of S2 and R1 trains, test operation start and tour, and images of Kyushu Shinkansen trains and limited express trains after the opening of the entire line.