Product description ※Please note that product information is not in full comprehensive meaning because of the machine translation.
[Recording Time]
85 minutes
[Screen Size]
Wide
[Special Image Contents]
Electrification Inauguration Start Ceremony / Rolling Stock Introduction at Kakogawa Railway Department
[List of Contents]
Between Kakogawa and Tanikawa
[Number of Tickets]
1
[Image Comments]
The front-view image of the Kakogawa Line electrified in December 2004. It is a must-see that takes a picture of the train running along the flow of the Kakogawa from Sanyo Main Line and Kakogawa station to Fukuchiyama Line and Tanikawa station with a high-definition HDTV camera.
[Country of Manufacture]
Date